UNO+UNO

HydroElectric Power Plant - Tajuña River, Madrid, Spain

SALE OF "DEL CONGOSTO" HYDROELECTRIC POWER PLANT

Villa used to produce electricity, located in the municipality of Perales de Tajuña, sites Congosto, Fencing and Cerro de Morata.

The Central Award is valid until the year 2061, the river flows Tajuña instant, provided by the Tagus River Basin.

Technical data

WATERCOURSE:Tajuña River

CLASS AND CONDITION: Electricity and Irrigation

GROSS HEAD (M): 7,34

MUNICIPALITY AND PROVINCE MAKING: Perales de Tajuña (Madrid).

MAXIMUM FLOW GRANTED: (L/SEG): 4.300

IRRIGATED AREA (Has): 73

EXPIRY DATE: January 1st, 2061

SPILLWAY

DRAIN CHANNEL

INPUT CHANNEL

<p

ENGINES ROOM

PRESSURE PIPE

To request technical and economic study please complete the form below:

Request Interview

Required field
Please, enter the captcha.
  

Additional Info

  • Item Price: € 1.000.000,00
Last modified on Sunday, 03 March 2013 20:48

Request interview

Request interview On-line

For an account excecutive

will contact you please

fill the form below

 

REQUEST CONTACT

Contact Info Argentine Location

To call  us can do to

Tel +5411 5263 0126

From Mon to Frid, 11 to 17 hs

 

LOCATION IN ARGENTINE

Lavalle 1567, Loc. 11

(C1048AAK) C.A.B.A.

República Argentina

Our Skills

  • Business Managment
  • Comprehensive consulting
  • Extensive experience
  • Permanent Staff
  • Custom advice

Real Estate

  • Appraisals
  • Merchandising
  • Marketing 24hs
  • Legal Support
  • Tax advisors

Accounts

  • Account Executives
  • Custom information
  • Most profitable
  • Date Prices
  • Daily Reports

© 2016 by UNO+UNO Gestión de Negocios. All rights reserved.