Logo
Print this page

HydroElectric Power Plant - Tajuña River, Madrid, Spain

SALE OF "DEL CONGOSTO" HYDROELECTRIC POWER PLANT

Villa used to produce electricity, located in the municipality of Perales de Tajuña, sites Congosto, Fencing and Cerro de Morata.

The Central Award is valid until the year 2061, the river flows Tajuña instant, provided by the Tagus River Basin.

Technical data

WATERCOURSE:Tajuña River

CLASS AND CONDITION: Electricity and Irrigation

GROSS HEAD (M): 7,34

MUNICIPALITY AND PROVINCE MAKING: Perales de Tajuña (Madrid).

MAXIMUM FLOW GRANTED: (L/SEG): 4.300

IRRIGATED AREA (Has): 73

EXPIRY DATE: January 1st, 2061

SPILLWAY

DRAIN CHANNEL

INPUT CHANNEL

<p

ENGINES ROOM

PRESSURE PIPE

To request technical and economic study please complete the form below:

Request Interview

Required field
Please, enter the captcha.
  

Additional Info

  • Item Price: € 1.000.000,00
Last modified on Sunday, 03 March 2013 20:48
© 2016 by UNO+UNO Gestión de Negocios. All rights reserved.